The project is ready for final inspection of:

65 - 7X7 posts, hand dug 3 ft. deep
65 bags of premix
310 steel posts
15,500 ft. electric wire
1 - 110V charger
1- energizer solar charger
18 gate systems
6 yds. concrete
64 tons gravel
2500 ft. water line
5 watering tanks
5 shut off valves
15 days of bobcat work
7 days backhoe/trencher work
-------------------------------------------------------------------------------------------------------------

I think the cows are satisfied!!!